Issued vide CO No.WL/30-4/Assn/2013 dated 22-10-2013
Present
Administrative
Side
|
Staff
Side
|
||
1.
|
Shri Pawan Ku. Singh
DPS(HQ), Circle Office,
Bhubaneswar
|
1.
|
Shri Pitabasa Jena, Circle Secretary, AIAIASP -cum-
Manager(Project Arrow), O/o the CPMG, Bhubaneswar
|
2.
|
Shri G.C. Sahu,
Asst. Director (WL)
Circle Office,
Bhubaneswar
|
2.
|
Shri Bibhudatta Behera, Treasurer, AIAIASP-cum-IP(PG), Bhubaneswar
|
New Items
Item No. 1-9/2013:- Request for maintaining uniformity on adherence of
procedures while making ad-hoc arrangement in PS Group-B Cadre and ASP Cadre.
Brief:
At present ad hoc promotion to PS Group-B Cadre and ASP Cadre is being done on
the basis of seniority-cum-fitness after proper screening of the records of the
officers from feeder cadre.
This Association requests to consider all the
candidates who have declined earlier or who were found unsuitable earlier at
the time of preparing fresh panel for ad-hoc promotion to new vacancies.
Validity of a panel may be restricted to six months or till preparation of a
fresh panel, whichever is earlier. Calling for willingness may be dispensed with
and the offer for appointment may be made from the select panel as per the
seniority for the new vacancies.
Reply:- Suggestion of the Association is agreed to accept the time
period for which the panel will remain. The decision on the same will be taken
on the basis of Directorate guidelines in the matter.
Action: AD(Staff)
Item No. 2-9/2013:- Request for finalization of the shifting proposal of the
Office of the 1) ASP, Central Sub-Division, Bhadrak, 2) IP, Bhadrak West Sub Division and 3) IP,
Bhadrak East Sub-Division from the existing rented building to a new rented
building.
Brief:
It is learnt that SPOs, Bhadrak Division has submitted a proposal for shifting
the Office of the 1) ASP, Central Sub-Division, Bhadrak, 2) IP, Bhadrak West Sub Division and 3) IP,
Bhadrak East Sub-Division from the existing rented building to a new rented
building vide his office letter No.D-63 dated 20-6-2013. The Land Lord/ Land
Lady of the existing rented building has issued a notice to vacate his /her
house and now pressing hard. The rent of the proposed new building i.e. ₹4900/- is less than the
existing building i.e. ₹5000/-.
Therefore, this Association requests for early
finalization of the shifting proposal submitted by the SPOs, Bhadrak Division.
Reply:- This will be resolved within 30th October, 2013.
Action: AD(Building)
Note:-Matter has already been finalized and
approved for shifting.
Item No. 3-9/2013:- Release of 10 percent of the PLI incentive deducted at
the time of sanction of incentive for procurement of Proposal.
Brief:- Considering the request of this Association
through Agenda No.5-04/2013 in four monthly meeting of CPMG, instruction has
been issued vide C.O. Letter No.L1/1-12/2010 dated 11-04-2013 to all concerned
for releasing the 10% of the incentive which was not paid earlier on
verification of first six deposits. But there is no clarity regarding releasing
the 10% of the incentive which was not paid for which 90% of the incentive was
sanctioned by PLI Section of Circle Office.
Therefore, this Association requests for issuance of an
instruction clarifying the position viz. who will release remaining 10% and
how.
Reply:- DDM(PLI) will please issue clarification especially on the 90%
incentives paid to the IPs/ASPs from CO for which no information is available with
the Regions and Divisions. Necessary guidelines on the matter will be issued
to all Divisional Heads.
Action: DDM(PLI)
Old Items
Item No. 4-8/2012:- Request for convening DPC for regular promotion to ASP
Cadre for all existing and anticipated vacancies during the year-2012 to
mimimize the adhoc arrangement.
Brief:
At present ad hoc promotion is given to IPs to ASP cadre for 11 months with the
arrangement of termination of ad hoc arrangement on completion of 11 months.
The practice of giving a break periodically and appointing the same person on
an adhoc basis is discouraged in the DOPT OM No.28036/8/87-Estt.(D) dated
30.3.1988. IPs who have been granted GP of Rs.4,600/- in financial up-gradation
under MACP are not entitled for further benefit of pay fixation on normal
promotion to ASP Cadre. On the other hand the qualifying period for earning an
increment is now 6 months on 1st July. Therefore, this Association
suggests for continuity of adhoc arrangement in ASP cadre beyond one year by
obtaining prior approval of DOPT.
Presently there are two vacancies in ASP Cadre and four
more retirement vacancies will arise shortly. This Association requests for convening DPC for regular promotion to
ASP Cadre for all existing and anticipated vacancies during the year-2012 to
mimimize the adhoc arrangement.
Reply:-Proposal has already been submitted to Directorate vide this
Office Letter No.ST/24-2/84-Corr dated 07-08-2012. No reply there to have been
received. DPC for regular promotion to ASP Cadre has since been held on
15-03-2013
Action:-AD(Staff)
(Item closed)
Item No.1-3/2012:- Request for required amenities and civil
maintenance of Inspection Rooms in the Circle.
Brief:- Most of the Inspection Rooms in the Circle
are in very bad shape and condition without regular maintenance of civil work.
In some cases there is even no required furniture like fixed Beds, Mattresses,
Sofa, Almirahs, Dining Table, Sofa etc. Case of the IR at Ashoknagar MDG is
cited as an example. Most of the fixed beds and mattresses in the IR at
Ashoknagar MDG are damaged and is being managed with folding beds. The
Association requests for issuing orders for providing the required civil
maintenance and amenities/ furniture like fixed Beds, Mattresses, Sofa,
Almirahs, Dining Table, Sofa etc in the Inspection Rooms in the Circle.
Reply:- The approval for
purchase of the furniture as proposed by the SSPOs, Bhubaneswar Division was
accorded by this office on 05-09-2012 and again on 09-09-2012. The position of
civil maintenance and availability of the furniture is looked over by the
SSPOs, Bhubaneswar whereas the reservation work is kept under the control of
AD(Personal). None of the above Officers have submitted any requisition either
for any civil maintenance work or for procurement of any such item after issue
of the above approvals. As regards other IQs located at various points under
Head Quarter Region, no such requisition has been received at this end from any
Divisional Heads.
Service Association has demanded the
provision of Almirah in IR of Ashoknagar MDG. SSPOs, Bhubaneswar will be asked
to supply the same at the earliest.
Action:-AD(Building/MM)
Item No.4-9/2011:- Request for
repairs/renovation of IQ at Puri.
Brief:- The
IQ at Puri is in very bad shape due to non-maintenance. Some photo shots on
3/7/2011 are attached. The photos themselves will speak about the conditions of
the IQ. The condition of the IQ presents the bad image about maintenance of the
IQ to the visitors to the tourist place from both inside and outside the
Circle. Repairs/ renovations of the IQ with the AC facility is requested.
Reply:- AA & ES for an amount
of Rs. 17,61,009/- has already been issued on dated 29-08-2013 for the work of
renovation of the IQ at Puri. The EE(Civil) has issued NIT on 11-09-2013. Work
order will be issued shortly for the said work.
Action:-AD (Building)
(Item Closed)
No comments:
Post a Comment